We present here just a few examples of our most recent projects, to show the diversity of our clients and partners, and of the projects we do with them. Due to the nature of our work we can not always share the details of the projects.
We provide world-class consulting services in the field of Engineering, Risk Management for offshore and onshore oil and gas upstream, midstream and downstream industries. We focus to provide quality services at affordable cost to meet customer requirements and always work to exceed customer expectation.
Projects done by iFluids Engineering
Month & Year
Client Name
Project Title
Status
Case Study
Nov 2019
Advanced Sys-TEK Pvt Ltd, Gujarat
Fire & Gas Mapping Study for IOCL Baitalpur Project
QRA Modelling for Risk Analysis study of IOCL-Allahabad & IOCL-Kanpur Pipeline
Completed
Aug 2019
Hindustan Petroleum Corporation Limited
, Telangana, India
Sprinkler System Study
Completed
Aug 2019
Nayara Energy Limited
, Dwarka
QRA for Sirohi Depot
Completed
Aug 2019
Enviro Resources
, Mumbai
QRA, HAZOP and ERDMP for Ennore Port Pipeline Project by M/s BPCL
Completed
Jul 2019
Coromandel International Limited
, Chennai
Developing and standardizing the P&ID for process plant of Coromandel International Limited
Completed
Jul 2019
Indian Oil Corporation Limited
, Gujarat
QRA for the Hydrocarbon Pipelines from Gujarat Refinery to Dumad
Completed
Jul 2019
Indian Oil Corporation Limited
, Dimapur
QRA & HAZOP Study of Dimapur LPG BP
Completed
Jun 2019
Indian Oil Corporation Limited
, Mathura
Safety Integrity Level (SIL) assessment study at Mathura Refinery
Completed
May 2019
Sterling and Wilson Pvt Ltd
, Mumbai
Consultancy for ONGC Hazira Project for Carrying out " Dispersion Modelling Assessment for Positioning of Hydrocarbon Vapour Detection System (F& G Mapping Study in 3D)
Completed
May 2019
Indian Farmers Fertilizer Cooperative Limited
, Gujarat
Consultancy Services for assessment safety of plant control Room & Installation of suitable Pressurizing systems at urea
Consultancy Services for Design of Laboratory at AL ANSAB
Completed
Apr 2019
Indian Oil Corporation Limited
, Missamari
Study on impact of Heat & Overpressure
Completed
Apr 2019
HOWE Engg. Projects (I) Pvt Ltd
, Chennai
QRA Study for Kattupalli terminal of Aadni Prots
Completed
Mar 2019
Velosi Certification LLC
, Qatar
HAZOP & CHAZOP work shop for COWI Musaimeer Pumping
Completed
Mar 2019
Methodic Engineers W.L.L
, Qatar
SIL Verification & SRS Report Preparation
Completed
Mar 2019
Indian Oil Corporation Limited (IOCL)
, Bongaigaon, India
HAZOP Study of BGR Complex Including Upcoming New units
Completed
Mar 2019
Qatar Kentz W.L.L
, Qatar
HAZID/HAZOP/SIL/QRA/SRS/SIMOPS Study
Completed
Mar 2019
Energoprojekt Entel (EPE)
, Qatar
Hazard Identification (HAZID) Study
Completed
Mar 2019
FLSmidth Private Limited
, Chennai, India
Conducting HAZOP for 680 TPH Dry Tailing Filtration Plant
Completed
Mar 2019
Energoprojekt Entel (EPE)
, Qatar
HAZID & HAZOP Study for GC161012F0 -Feed for Miscellaneous Electrical RFES within Dukhan Fields
Completed
Mar 2019
Indian Oil Corporation Limited (IOCL)
, Panipat, India
HAZOP and QRA Study
Completed
Feb 2019
Indian Oil Corporation Limited (IOCL)
, Mathura, India
RRA Study for Ethanol Blended MS Project at Mathura Refinery
Completed
Feb 2019
Numaligarh Refinery Ltd
, Numaligarh
Implementation of Process Safety Management (PSM) System at Numaligarh Refinery
Completed
Feb 2019
Bharat Petroleum Corporation Ltd
, Thanjavur, India
QRA & HAZOP Study at BCPL Thanjavur LPG Plant
Completed
Feb 2019
L &T Hydrocarbon Engineering
, Mumbai, India
HAZOP Study for the project 100KTPA Chloromethane Plant at Dahej for GACL
Completed
Feb 2019
Rainbow Control Systems Pvt Ltd
,
HAZOP Study of a Refinery Project
Completed
Feb 2019
Indian Oil Corporation Limited (IOCL)
, Panipat
HAZOP & SIL Determination Study for Benzene Extraction unit (BEU) at Panipat Naphtha Cracker Complex
Completed
Feb 2019
L &T Hydrocarbon Engineering
, Mumbai, India
HAZOP Study for the project 100KTPA Chloromethane Plant at Dahej for GACL
Completed
Feb 2019
Velosi Certification LLC
, Qatar
QRA Study for Al Mamura Petrol Station
Completed
Feb 2019
Maruti Suzuki India Limited
, Haryana, India
HAZOP (Hazard Operability) Study of Heat Treatment Process
Completed
Feb 2019
IOCL, Panipat, India
Scope: HAZOP & SIL Determination study for Benzene Extraction Unit at Panipat Naphtha cracker complex
Completed
Feb 2019
Rainbow Control Systems Pvt Ltd
, Mathura, India
HAZOP Study of a Refinery Project
Completed
Feb 2019
IOCL, Mathura Refinery, Mathura, India
RRA Study for LPGTU- Revamp Project at Mathura Refinery
Completed
Jan 2019
IOCL, Gujarat Refinery, Gujarat, India
Power system study for installation of 24/30 MVA, 33 KV/33 KV unit ratio transformers at substation 39 of Gujarat Refinery.
Completed
Dec 2018
Numaligarh Refinery Limited, Numaligarh, India
Consultancy Services for Fire and Gas Study at Numaligarh Refineryand Marketing Terminal.
Completed
Sep 2018
Technip India Ltd., Chennai, India
Noise Mapping for proposed new facilities for study for Pertamina FEED Services
Completed
Sep 2018
Al Arfaj Engineering, Kuwait
Feasibility Study for New Fire Stations at MAA and MAB Refineries
Completed
Aug 2018
HAL OFF SHORE LIMITED, Gujarat, India
QRA & HAZOP Study for Hal offshroe, Meshana.
Completed
Aug 2018
Hindustan Petroleum Corporation Ltd. (HPCL), Loni
ERDMP Certification for HPCL Loni terminal
Completed
Aug 2018
Gail Gas Limited, Bengaluru
QRA for 7 CNG Stations & associated pipelines of GAIL Gas Ltd.
Completed
Aug 2018
QATAR FERTILISER COMPANY (QFACO) / DEBAJ, Qatar
Installation of New Auxiliary Boiler B8330 / all associated Tie-ins/ interconnections with existing plant/ Demolition of existing Temporary Boiler and Auxiliary Boiler B8302 in Ammonia-3 Utility area
Completed
Aug 2018
ICICI Bank Ltd., Chennai, India
Electrical Safety Audit & Thermography for ICICI Bank Cenotaph Road Branch
Completed
Aug 2018
Indian Oil Corporation Limited (IOCL), Pune
HAZOP Study, Qualitative Risk Analysis, Preparation of Emergency Response Disaster Management Plan and Certification from PNGRB approved agency for IOCL Pune BP
Completed
Aug 2018
Indian Oil Corporation Limited (IOCL), Dharamanagar
QRA & HAZOP Studies for IOCL Dharmanagar Depot
Completed
Aug 2018
Oman Oil Refineries and Petroleum (ORPIC), Oman
IHT-Aviation Quality Control-MSPP
Completed
Aug 2018
VALDEL LLC, Oman
Technical safety and Fire system design for Additional separation facility at DPS
Completed
Aug 2018
Tebodin ME,
HSE Services
Completed
Aug 2018
Chemsys Process Engineering Pvt. Ltd., Chennai, India
Technical Safety for RLNG Piping
Completed
Aug 2018
EXTERRAN, Abu Dhabi, UAE
Pulsation Study for AGIC-Tatweer Phase VI
Completed
Jul 2018
Exterran, Sharjah, UAE
Pulasation Study for AGIC-Tatweer Phase VI
Completed
Jul 2018
IFFCO, Kalol Unit
QRA & HAC Study for IFFCO Kalol Unit
Completed
Jul 2018
Projects House Engineering Consultancy, Kuwait
Feasibility Study for New Fire Stations at MAA and MAB Refineries
Completed
Jul 2018
Velosi Certification LLC, Qatar
Consequence Modelling for Aziz Petrol Station
Completed
Jul 2018
Sparklet Engineers Pvt. Ltd., Mumbai, India
Pre Bid Engineering
Completed
Jul 2018
Indian Oil Corporation Limited (IOCL), Gujarat, India
Comprehensive Risk Analysis of Gujarat Refinery
Completed
Jul 2018
Velosi Certification LLC, Qatar
Preparation for HAZID and Design risk Assessment work and report review.
Completed
Jun 2018
HAL OFFSHORE LIMITED, Mehsana, Gujarat
Pre Bid Engineering for Revamping of Fire Protection System at Installations of Mehsana Asset
Completed
Jun 2018
Sonar Bharat Environment & Ecology Pvt. Ltd., Jaisalmer, India
QRA Modelling for Risk Analysis study of GAIL - DGRPL & LRPL Pipeline at Ramgarh Region in Jaisalmer
Completed
Jun 2018
VEC Resources & Energy, Oman
Deployment of C&A Engineer
Completed
Jun 2018
GEIC / QP, Qatar
IMS Data Collection Population of Piping
Completed
Jun 2018
Velosi Certification LLC, Qatar
Consequence Modeling Stuty for West Bay Petrol Station
Completed
Jun 2018
HAL OFFSHORE LIMITED, Mehsana, Gujarat
HAZOP for Mehsana ONGC Asset
Completed
May 2018
KENTZ Engineers & Constructors, Qatar
HAZOP Study
Completed
May 2018
HAL OFF SHORE LIMITED, Mumbai, India
Process Simulation Model and Report for EPS using HYSYS Software
Completed
May 2018
VEC Resource & Energy, Oman
HAZOP Chairman
Completed
May 2018
Hindustan Petroleum Corporation Ltd. (HPCL), Loni
QRA study for HPCL Loni Terminal
Completed
May 2018
VEC Resource & Energy, Oman
ESD Initiation on Confirmed F&G Detection
Completed
May 2018
Black Cat Consulting & Engineering Services WLL, Doha, Qatar
HAZID Study for FEED for Dukhan Production Facilities Upgrade Phase 1A
Completed
May 2018
Lanxess Energizing Chemistry, Maharashtra,India
Man Power
Completed
Apr 2018
Mercury Training Center (MTC), Tunisia
HAZOP & SIL Leader certification at TUNIS
Completed
Apr 2018
TUV Middle East W.L.L, Abu,Dhabi
Study for Safety Integrity Function (SIF)
Completed
Apr 2018
Indian Oil Corporation Limited (IOCL), Digboi, Assam
Conducting QRA & HAZOP Study at Digboi Marketing Terminal
Completed
Apr 2018
KAVIN Engineering, Coimbature
HAZID/HAZOP/SIL Study for Oil India Project
Completed
Apr 2018
KENTZ Engineers & Constructors, Qatar
HAZOP Study for ORYX Project
Completed
Apr 2018
KENTZ Engineers & Constructors, Qatar
HAZID Study, HAZOP Study and What If Analysis for QP FEED
Completed
Apr 2018
VEC Resource & Energy, Oman
Secondment of Technical Safety Engineer for Retrospective HAZOP for GGP at PDO
Completed
Apr 2018
Roots Energy & Engineering, Doha, Qatar
Conducting HAZID & HAZOP Session, Development of HAZID & HAZOP package, Report & close-out Report of GC17106400 (EPIC) S O W for Production Separator Upgrade, Replacement of Hydro Cyclones and Piping Early TIE-INS at Jaleha Degassing Station as per QP Requirements
Completed
Apr 2018
Gail (India) Limited, Vijaypur, M.P.
Surge Analysis of LPG Pipeline
Completed
Apr 2018
Indian Oil Corporation Limited (IOCL), Missamari
QRA study for IOCL Missamari Depot
Completed
Mar 2018
Gail (India) Limited, Vijaipur, M.P.
Consultant for Risk Assessment of the Pipeline under HVJ Pipeline System as per PNGRB Guidelines.
Completed
Mar 2018
VALDEL LLC, Oman
Quantitative risk Assessment (QRA) modelling, Preparation the HSSE Plan and HSE Design Philosophy and assessment of the additional separation facility at B-block station (VALDEL)
Completed
Mar 2018
Abraj Energy Services S.A.O.C., Oman
Deployment Plan and Implementation for LSS in 2018
Completed
Mar 2018
VEC Resource & Energy, Oman
HAC for On/Off plot for SRCPP, MBK, SNGP, KGP GGP and Barik.
Completed
Mar 2018
Abraj Energy Services S.A.O.C., Oman
Deployment Plan and Implementation for LSS in 2018
Completed
Mar 2018
Gail (India) Limited, Vijaipur, M.P.
Consultant for Risk Assessment of the Pipeline under HVJ Pipeline System as per PNGRB Guidelines.
Completed
Mar 2018
VALDEL LLC, Oman
Quantitative risk Assessment (QRA) modelling, Preparation the HSSE Plan and HSE Design Philosophy and assessment of the additional separation facility at B-block station (VALDEL)
Completed
Mar 2018
VEC Resource & Energy, Oman
HAC for On/Off plot for SRCPP, MBK, SNGP, KGP GGP and Barik.
Completed
Mar 2018
WK Asia Pacific Environment PTE Ltd, Singapore
Study of Dispersion modelling of stack specifications
Completed
Mar 2018
Tata Projects, Abu Dhabi, UAE
Hazop study at ORYX GTL ltd,Qatar
Completed
Mar 2018
Indian Oil Corporation Limited (IOCL), Bishalgarh, Tripura
ERDMP update with latest facilities at LPG BP
Completed
Mar 2018
Chennai Petroleum Corporation Limited, Chennai, India
Project Management consultancy(PMC) services for shiftingof Asphalt Bulk Loading Bay from CPCL to MPL land at chennai
Completed
Mar 2018
Harsco India Private limited, Karnataka, India
HAZOP study and Training
Completed
Mar 2018
Ratnagiri Gas & Power Private Limited, Ratnagiri, India
QRA study for LNG terminal including Jetty
Completed
Mar 2018
Lanxess India Private limited, Maharashtra, India
10 Training on 5 Why at Bhade,Jhagadia
Completed
Mar 2018
HAL Offshore limited, Mumbai, India
Flare Net Analysis, Fire & Gas Mapping study and Material Handling study
Completed
Mar 2018
Indian Oil Corporation Limited (IOCL), Imphal, India
HAZOP & QRA at Sekmai LPG Bottling Plant
Completed
Feb 2018
Qatar Kentz WLL, Doha, Qatar
HAZOP & Risk Session for WO-20
Completed
Feb 2018
Kalpataru Power Transmission Limited, Mumbai, India
Provision of Gas Concept and Optimization Consultant
Completed
Oct 2017
Indian Oil Corporation IOCL, Haldia, India
Hiring of Safety Supervisors for compliance of Safety Norms, Procedures & imparting safey norms, procedures and impartingsafety training during shutdown
Completed
Oct 2017
Oman Gas Company, Muscat, Oman
Pressure Regulator with Gauges Supply
Completed
Oct 2017
Ramboll, Doha, Qatar
Provision of SIS (Safety Integrity System) & Hazardous Area Classification (HAC)
Completed
Oct 2017
Cairn India Ltd., Rajahmundry, India
Carry Out Comprehensive Study on Gas Compression System at Ravva.
Completed
Oct 2017
Hindustan Petroleum Corporation Limited, Hubli, India
Hazop and Hazid study for LPG plant
Completed
Sep 2017
Vimta Labs Ltd., Hyderabad, India
Safety Audit Study - HAZOP, QRA, ERDMP
HAZARD AND OPERABILITY STUDY
Completed
Sep 2017
Essar Oil Limited
, Dwaraka , India
Conducting HAZOP study for the refinery units
Completed
Sep 2017
Indian Oil Corporation Limited (IOCL)
, Panipat , New Delhi
Providing Safety Supervisors for PNC
Completed
Sep 2017
Bharath Petroleum Corporation Limited
, Haridwar, India
ERDMP Preparation and Certification for Haridwar Depot
Completed
Sep 2017
Ultra-Tech Environmental Consultancy & Laboratory, Goa, India
HAZOP & QRA for POL Jetty at Vasco Bay
Completed
Sep 2017
Oman Gas company, Muscat, Oman
Electrical Troubleshooting of Flare and Spare Replacement
QRA & DMP for proposed LPG BP at Korba, Chattisgarh
Completed
Mar 2017
Precision Engineering & Consultancy
, Oman
Alarm Rationalization Study.
Completed
Mar 2017
Precision,Oman, Oman
Alarm rationalization for OXY
Completed
Mar 2017
Indian Oil Paradhip, Paradhip , Odisha
Model building & Network Analysis for interconnection of fire water line between Paradhip & Paradhip refinery
Completed
Feb 2017
Ultra-Tech Environmental Consultancy & Laboratory, Belgaum, India
QRA, HAZOP,& ERDMP for IOCL Belgaum Depot
Completed
Feb 2017
Green Care Engineering India Pvt ltd
, Ranipet , India
Risk Assessment study for the Effluent Treatment Plant & RO system
Completed
Feb 2017
Tebodin Middle East, Bahrain
Traffic Survey Report Preparation
Completed
Feb 2017
Hindustan Petroleum Corporation Limited, Rajasthan, India
QRA,HAZOP & ERDMP study for Bharatpur IRD, Bharatpur, Rajasthan
Completed
Feb 2017
Hindustan Petroleum Corporation Limited (HPCL), Kolkata, India
QRA & HAZOP for Paharpur LPG Plant, Paharpur, Kolkata
Completed
Feb 2017
Ultra-Tech Environmental Consultancy & Laboratory, Cochin, India
Quantitative Risk Analysis (QRA) & Disaster Management Plan (DMP) for IOCL cochin LPG BP
Completed
Feb 2017
Jayathe Petrotech Engineers, Cochin, India
Project Risk Analysis (PRA) for FSF, EPF, Power Plant & Export Pipeline projects for RPOC Sudan/HAZOP review for EPF, power plant & export pipeline projects for RPOC Sudan
Completed
Feb 2017
Assam Gas Company, Assam, India
Design & Develop Fire Safety system and associated work for compressor station of AGCL
Completed
Feb 2017
Indian Oil Corporation Limited (IOCL), Odisha, India
Unit Risk Analysis on all CRWS Lift stations.
Completed
Feb 2017
Ultra-Tech Environmental Consultancy & Laboratory, Bhopal, India
Quantitative Risk Analysis (QRA) & Disaster Management Plan (DMP)
Completed
Jan 2017
Jayathe Petrotech Engineers, Kochin,India
HAZOP for RPOC FSF Projects for RPOC, Sudan
Completed
Jan 2017
SAGAÂ Consulting Solutions, Salem,India
QRA for 3.6 Km 20 Dia. Propane & Butane carrying pipeline of IOCL, Kochi
Completed
Jan 2017
Sparklet Engineers Pvt ltd
, Mumbai, India
General HSE Induction
Completed
Jan 2017
ERM Emirates, UAE
EPD -Spl & Reconeft Platform & FRA Reconeft platform & site visit
Completed
Dec 2016
Gail India Limited, Kochin,India
HAZOP Study of Modified GAIL Kochi Skid inside BPCL
Completed
Dec 2016
Maharashtra State Power Generation Company Limited (MAHAGENCO) Â Â Â Â Â Â Â , Mumbai,India
Preparation and Submission of Risk Analysis Plan of GTPS Plant under Under Factor Act 1948.
Completed
Dec 2016
SPEC Oil & Gas Technologies, Dubai,UAE
F&G Mapping Study for Gas Processing Facility (GPF-III) at Gambat South Block for Gas, LPG and Condensate production.
Study on Adequacy of Fire Fighting System at HPCL, Jawahar Dweep Mumbai Port Trust
Completed
Dec 2016
Rock International Engineering Consultancy, Muscat,Oman
Providing Manpower for Engineering support work for Marmul Cluster As Built and other works.
Completed
Nov 2016
Oman Oil Refineries and Petroleum Industries Company (ORPIC), Sohar,Oman
Supplier Relationship Management - 2 day workshop about trends and best practices in Supplier Relation Management
Completed
Nov 2016
Emirates ERM, Abu Dhabi,UAE
Fire Risk Assessment (FRA) & Explosion Protection Study (EPS) for Lafarge Cement Plant, UAE.
Completed
Nov 2016
Carlton Industrial Engineers, Mumbai,India
Stress Analysis for GRE Pipelines
Completed
Nov 2016
PL Engineering, Gurgaon,India
Transient surge analysis using OLGA Software for the 14" NGL pipeline (300 km long buried)
Completed
Nov 2016
Oman Oil Refineries and Petroleum Industries Company (ORPIC), Sohar,Oman
CIPD Learning and Development - Foundation course for learners in Learning & Development , certified by Chartered Institute for Learning & Development (UK)
Completed
Nov 2016
Hindustan Petroleum Corporation Limited (HPCL), Andra Pradesh,India
Electrical Safety Audit for Vishaka, Rajahmundry and Vijaywada Pipeline Spread.
Completed
Nov 2016
Indian Oil Corporation Limited (IOCL), Mundra,India
Detailed Engineering and Feasibility Study of proposed sea water pipeline at WRPL Mundra
Completed
Nov 2016
PL Engineering, Gurgaon,India
Hydraulic Analysis using Pipesim Software for the 14" NGL pipeline (300 km long buried)
Completed
Oct 2016
Indian Oil Corporation Limited (IOCL), Mathura Refinery,India
Rapid Risk Analysis (RRA) of Existing Control Room near NPRU at Mathura Refinery and Proposed Control Room near OHCU & FCCU Units.
Completed
Oct 2016
Technip Middle East, Doha,Qatar
HAZOP Study for Qatar Gas NFB Project.
Completed
Oct 2016
Dome Oilfield Engineering & Services LLC, Abu Dhabi,UAE
Design Review for 14" & 32" NGL pipeline (300 km long buried)
Completed
Oct 2016
Technip India Ltd, Chennai,India
QRA for Jetty, Pipeline and Tank Farms, Escape Evacuation and Rescue Analysis (EERA) for LPG Terminal Mundra Port.
HAZOP, QRA & Offsite DMP for Mysore LPG plant & LPG pipeline receiving station
Completed
Aug 2016
Essar Oil Ltd, Jamnagar,India
Comprehensive Safety Audit as per IS 14489:1998, OISD 145, Gujarat Factory Rules (GFR) 68-J under section 41 of Factor Act
Completed
Aug 2016
Tebodin Middle East Ltd, Doha,Qatar
NGL Dynamic Simulation Study for Qatar Gas Train 4 and Train 6
Completed
Aug 2016
Salalah Methanol Company L.L.C, Salalah,Oman
Failure Analysis for E1101 NG Flange Weld crack
Completed
Aug 2016
Tebodin Middle East Ltd, Doha,Qatar
Surge Analysis using TLNet Software for FEED for MTBE Tanks and Pipeline between QAFAC and QP Refinery - Mesaieed
Completed
Aug 2016
Oman Oil Refineries and Petroleum Industries Company (ORPIC), Sohar,Oman
Varian Gas Chromotography - Intensive course in Operation , Maintenance & Troubleshooting of GC's
Completed
Aug 2016
Velosi Certification LLC, Doha,Qatar
HAZID & HAZOP for EPIC with Qatar Petroleum (QP)
Completed
Aug 2016
Haldia petrochemicals Ltd (HPL), West Bengal,India
Study and review of 132 KV Grid islanding scheme and 6.6KV Bus coupler scheme of 116 MW Captive Power Plant (CPP) of Haldia Petrochemicals Ltd, Haldia
Completed
Jul 2016
Tebodin Middle East Ltd, Doha,Qatar
e-HAZOP / SAFOP for FEED for MTBE Tanks and Pipeline between QAFAC and QP Refinery - Mesaieed
Completed
Jul 2016
Gail India Limited, Mumbai,India
QRA of Natural Gas Pipeline Stations & Terminals Under Maharashtra Region Pipeline System (767 km length in Trombay region, Thal Region, DUPL Region and DPPL Region in an around Mumbai and parts of Maharashtra)
Completed
Jul 2016
Methodic Engineer W.L.L / CCC, Doha,Qatar
HAZID, HAZOP, SIL Assessment & Verification for EPIC for Hamad International Airport Jet A-1 Supply.
Completed
Jul 2016
Rock International Engineering Consultancy, Muscat,Oman
Providing Piping Engineering & Piping Designer for support work for As Built and other works.
Completed
Jul 2016
Methodic Engineer W.L.L, Doha,Qatar
ISO Certification
Completed
Jul 2016
Oman Oil Refineries and Petroleum Industries Company (ORPIC), Sohar,Oman
Fundamental of Trading and pricing - Intensive course on Trading & Pricing principles in Oil & Gas
Completed
Jul 2016
Assam Gas Company Ltd, Assam,India
HAZOP & QRA for Natural Gas Pipeline system, Compressor Stations and City Gas Distribution network.
Completed
Jun 2016
Methodic Engineer W.L.L, Doha,Qatar
Engineering Consultant: Ramboll Middle East,
HAZOP Study for FEED for Mechanical SOR in Dukhan Field, QP.
Completed
Jun 2016
Methodic Engineer W.L.L / DOPET W.L.L, Doha,Qatar
HAZID, HAZOP, SIL Assessment & Verification, SIMOPS, e-HAZOP/ SAFOP for EPIC for Expansion of Pilot CNG Refueling Station at SAMI (ECRS) - Qatar Petroleum.
Completed
Jun 2016
Indian Oil Corporation Limited (IOCL), Barauni, India
QRA at Barauni Terminal and Gas Assessment as per OISD 244.
Completed
Jun 2016
ABS Industrial Verification India Pvt Ltd, Delhi,India
HAZOP Study for U-60 Steam Generation Plant of Al Zhor Refinery Project
Completed
Jun 2016
ESSAR OIL LTD, Jamnagar,India
Re-HAZOP study for Refinery Units, Essar Oil Limited, Vadinar Site. 1) CDU-1-VDU-SGU (Unit No.10, 11, 13: Approximate no. of P&IDs 110).
2) UTILITIES (Base Refinery: Approximate no. of P&IDs 81).
3) UTILITIES (Train-1: total P&IDs no. 154: Approximate no. of P&IDs 154)
4) Dispatch (Road and Rail) (Unit No. 76 and 77: Approximate no. of P&IDs 70).
5) Isomerization (Unit No. 131: Approximate no. of P&IDs 80).
Completed
Jun 2016
Tebodin Middle East Ltd & Bahrain Petroleum Company (BAPCO), Bahrain
QRA for Additional Gas Supply Line to Al-Ezzel Power Company
Completed
Jun 2016
OMAN LNG, Sur,Oman
Advance Scaffolding Training
Completed
Jun 2016
Indian Oil Corporation Limited (IOCL), Mathura Refinery,India
Design & Detailed Engineering Services for Conversion of Fixed Roof HSD Tank to External FLoating Roof HSD Tank of 20,000 KL and 5,000 KL Tank.
Completed
Jun 2016
Indian Oil Corporation Limited (IOCL), Bijwasan,India
HAZOP & QRA at NRPL Bijwasan Pump Station
Completed
Jun 2016
Yousuf Bin Ahmed Al-Aamir Trad, Muscat,Oman
Detail Engineering on Fire Detection Systems & Fire Protection system for the SOHAR Independent Water Plant inside OPRIC Refinery.
Completed
May 2016
OMAN LNG, Sur,Oman
Risk Management In-House Training - 4 day programme covering all aspects of Hazards and Risk Management
Completed
May 2016
Rock International Engineering Consultancy, Muscat,Oman
Providing 2 Site Validation Engineers for Engineering support work for Marmul Cluster As Built and other works.
Completed
May 2016
TUV Middle East/ Petrofac International Limited, Abu Dhabi,UAE
Sil Assessment Study for OPRIC Refinery Phase II Expansion Project.
Completed
May 2016
Ashghal / GEIC, Doha,Qatar
Secondment Contract for Professional Staff for Engineering Business Support Department. Project ID: EBSD 14/15 SE 004 G
Completed
May 2016
Numaligarh Refinery Limited (NRL), Assam,India
HAZlD and SIMOPS study for (i) DHDT project and (ii) LPG Mounded Bullet and LPG bottling plant upgradatjon project (COMM/C10/3032)
Completed
May 2016
Oman Oil Refineries and Petroleum Industries Company (ORPIC), Sohar,Oman
Process Design Fundamental (10 day program) - Practical insights of chemical engineering unit operations
Completed
May 2016
ORYX GTL & Tata Projects, Doha,Qatar
HAZOP Study and Preparation of Report at ORYX GTL Plant in Raslaffan