IFLUIDS ENGINEERING
Case Studies
Engineering Excellence: Real-World Solutions
Explore our case studies to see how iFluids Engineering tackles real-world challenges across industries. These examples showcase our expertise in:
- Fluid dynamics analysis
- Process optimization
- Safety management
- Regulatory compliance
Each study demonstrates how we apply innovative techniques to deliver measurable improvements. Whether you’re facing similar challenges or exploring potential enhancements, discover how our solutions drive efficiency and safety.
Use the search bar to find specific cases or browse our diverse project portfolio below.
ENVID Study for NFA & WHP3 Project: Environmental Impact & Mitigation
Introduction The Environmental Impact Identification (ENVID) study for the NFA & WHP3 project, focusing on the engineering, procurement, installation, and commissioning (EPIC) of miscellaneous infrastructure works, is a critical part…
View Details
ENVID Study for LPB 31 Facilities & CSF Oil Spill Boom at RLIC
Introduction The Environmental Issues Identification (ENVID) study for the Expansion EPIC for LPB 31 Facilities & CSF Oil Spill Boom at Ras Laffan Port (RLIC), initiated by QatarEnergy and executed…
View Details
Enhancing Conveyor Safety at Hindustan Zinc Through HAZOP Methodology
Overview What is HAZOP? The Hazard and Operability (HAZOP) Study is a methodical and organized evaluation of complex systems, like process facilities, aimed at identifying hazards that could pose risks…
View Details
Fire Water Hydraulic Analysis and Adequacy Study of Fire Protection Facilities at IOCL Panipat Refinery
Project Overview iFluids Engineering conducted a fire water hydraulic analysis and adequacy study at IOCL Panipat Refinery. The study aimed to evaluate the refinery’s fire water pumps, storage, and fire…
View Details
HAZOP Study for Compressed Biogas (CBG) Plant at Adarsh Gaushala, Gwalior: Enhancing Safety and Efficiency
Summary The HAZOP study successfully identified hazards and operability issues related to feed handling, digester operations, and biogas purification. Actionable recommendations were made to enhance safety, reliability, and efficiency, ensuring…
View Details
Flare Net Analysis at Honeywell’s Penang Plant: Ensuring Safety and Compliance
Introduction Honeywell is installing a new membrane test system at its Penang plant in Malaysia, which will operate in batch mode on weekends for testing. NRC Engineering (NRCE) is handling…
View Details
HAZOP Analysis for BPCL’s HGU Utilities Offsite BDT, COT, and SPM Units: A Case Study in Safety Management
Introduction The case study on the HAZOP study for the HGU (Hydrocracking Unit) utilities offsite BDT (Bottoms Depressant Tank), COT (Cooling Oil Tank), and SPM (Single Point Mooring) units at…
View Details
Qualitative and Quantitative Risk Assessment (QRA) for Nitric acid (250 MTPD WNA / 200 MTPD CAN) Plant at Nandesari,Vadodara, Deepak Chem Tech Limited.
COMPASS The compass of the work is to carry out the Quantitative Risk Assessment study for nitric acid plant of Deepak Chem Tech Limited. PURPOSE OF THE STUDY This study's…
View Details
HAZID and HAZOP Study for GCS Complex, ONGC CBM Asset in Bokaro, Jharkhand
iFluids Engineering was awarded to perform HAZID (Hazard Identification) and HAZOP (Hazard and Operability) for the entire Integrated GCS Complex, ONGC CBM Asset in Bokaro, Jharkhand Before being put into…
View Details
QRA Study for Piped Natural Gas Plant & CNG Storage at Toyota by McD Built Environment
Project Objective The primary goal of the Quantitative Risk Assessment (QRA) study was to quantitatively evaluate and assess the risks associated with process hazards at the Toyota Kirloskar Motors facilities.…
View Details