Marine Infrastructure Developer Pvt. Ltd. is going to execute 2 Enclosures, Enclosure 1 (5000KL x 12 tanks) and Enclosure 3 (5000KL x 4 Tanks). Marine Infrastructure Developer Pvt. Ltd has awarded iFluids Engineering to carry out Quantitative Risk Assessment (QRA) study for the 2 enclosures at Kattupalli Port.
MIDPL wants to execute 2 Enclosures, Enclosure 1 (5000KL x 12 tanks) and Enclosure 3 (5000KL x 4 Tanks).
Taking PESO CTE for the above enclosures with cargo class as per following table.
Enclosure 1 | 5000 KL x 12 Tanks | Class C Cargo (CBFS) |
Enclosure 3 | 5000KL x 4 Tanks | Bitumen (Excluded petroleum) |
To carry out Quantitative Risk Assessment i.e. QRA Study based on Guidelines for Quantitative Risk Assessment CPR 18 E (Purple book), Committee for the Prevention of Disasters, Netherlands (Edition: PGS 3, 2005) for the 2 enclosures,
- Enclosure 1 with the capacity of 5000 KL x 12 Tanks containing Class C Cargo (CBFS).
- Enclosure 3 with the capacity of 5000 KL x 4 Tanks containing Bitumen (Excluded petroleum).