Indian Oil Corporation Limited has awarded iFluids Engineering to carry "FIRE WATER ADEQUACY STUDY NETWORK AND ASSOCIATED FACILITIES AS PER OISD-STD-116 FOR BONGAIGAON REFINERY"
Bongaigaon Refinery is a petroleum refinery in Assam, India. It was commissioned on 20 February 1974 by the government of India.Refinery capacity was increased in 1995 to 2.35 million tonnes per year (51400 barrels per day of stream through expansion.
The study is performed for checking the adequacy of the existing fire, water network and identify their limitations while considering different combinations of the fire scenarios (as per OISD-STD-1116 ).
Existing facilities to be coveredunder this study are:
Hydrocarbon Storage Tanks (122 nos.) and 3 nos. Of LPG Horton spheres, 4 bays of LPG TT loading. Truck, LPG Bullet and Rail Wagon loading facilities/gantries.
Utilities & Off-sites, WWTP (ETP and TTP), LPG Bottling plant, Hydrogen storage (CRU Unit and DHDT block), Compressed air system, Instrument air system, firewater network
Flare Systems (Refinery, CRU MSQ units, DHDT Block), DM PLANT,CPU unit, Fuel gas and fuel oil network. KTU, Coke calculations Unit, All Electrical Substations of units, Bongaigaon refinery, CCU, Store & Warehouse.(Storage, Loading/unloading facility of chemicals etc.)
Upcoming new facilities to be cover under the study are:
Indmax Project:
Indmax FCC unit 740 TMTPA
Prime-G+ unit 312 TMTPA
LPG mounded bullets 3 x 3,000 m3
Cooling tower cells 2 x 2,600 m3/hr
BS-VI Project:
DHDT revamp 1,600 TMTPA
HGU revamps 30 KTPA (H2 production)
New NHT 235 TMTPA
New SRU 20 TPD
New ARU 42 m3/hr
Gasoline tank 8,900 m3
Completion Schedule:
The contract period is five (5) months from the date of the work order.
Documents Required:
PFD
P&ID
Fire fighting Layout
Nozzle details
Isometric diagram
FW flow calculation
Pump performance curve
Piping material Specification
Operating and control Philosophy
Fire water Analysis report
FWS Design basis for jetty area
Native file of existing FW network software models
Provide Velocity criteria of each pipe
Deliverables:
Kick off meeting shall be organized within three weeks of date of work order to discuss the methodology and timeline of the Project.
Draft report shall be submitted to IOCL Bongaigaon Refinery for review.
Final report to be submitted 2 weeks from the date of submission of the draft report.