Introduction

M/s. Vinplex India Private Limited successfully obtained Environmental Clearances (EC) from the State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu. This achievement was in alignment with the Environmental Impact Assessment (EIA) Notification 2006, issued by the Ministry of Environment, Forest, and Climate Change (MoEF&CC), under the category 8(b) – Township and Area Development Projects.

The case highlights the systematic approach taken by Vinplex India Pvt Ltd for their industrial park expansion in Maduravasal Village, Uthukottai Taluk, Tiruvallur District, Tamil Nadu.

Project Overview

The proposed expansion aims to enhance the existing industrial park with better infrastructure for parking and landscaping, ensuring environmental sustainability through adequate mitigation measures during construction.

Objectives

The primary goal was to secure Environmental Clearance (EC) for the expansion of the industrial estate. Vinplex India Pvt Ltd has been instrumental in developing tailored warehousing solutions since 2008, supporting sectors like logistics, FMCG, automotive ancillaries, electronics manufacturing, and light engineering.

Methodology

The expansion project followed the Environmental Clearance (EC) process as per EIA Notification 2006:

A visually structured flow diagram showcasing the methodology for obtaining Environmental Clearance (EC) as per EIA notification. It features three main steps: 1) Application for Terms of Reference (ToR), 2) Preparation of the Environmental Impact Assessment (EIA) Report, and 3) Appraisal and Submission. The diagram emphasizes the systematic approach involved in the expansion project process
Methodology
  • Application for ToR (Terms of Reference):
    • Submitted via the Parivesh Portal with required details and fees.
    • Reviewed and granted by the State Expert Appraisal Committee (SEAC), Tamil Nadu.
  • Preparation of the EIA Report:
    • Developed in compliance with the granted ToR conditions.
    • Uploaded on the Parivesh Portal for SEAC review.
  • Appraisal and Submission:
    • EIA/EMP reports reviewed and presented to SEAC.
    • Environmental Clearance granted upon completion of evaluations.

Conclusion

The diligent approach of Vinplex India Pvt Ltd ensured compliance with environmental regulations and the successful approval of the expansion project. The project stands as a benchmark for environmentally conscious industrial development.