Introduction
A power system reliability study is an engineering analysis that predicts how often an electrical network will lose supply, how long each outage will last, and which components cause it. The result is a set of reliability indices, such as SAIFI and SAIDI, plus a ranked list of fixes, so your budget goes to the parts of the network that genuinely threaten uptime.

At iFluids Engineering in Chennai, we carry out each power system reliability study for utilities, process plants, infrastructure projects and renewable energy developers across India. This page covers what the study includes, how it is done, what you receive and when to commission it.
What Is a Power System Reliability Study?
A power system reliability study models how well a network keeps supplying its loads over a set period, in normal operation and when equipment fails. For every component (transformers, feeders, breakers, relays, cables and standby sources) it uses three inputs: how often the item fails, how long repair or switching takes, and what backup exists.
From those inputs the analysis calculates expected performance for the whole system and for individual load points. In practice, it turns “we believe the plant is well backed up” into a measured figure you can defend in a design review or a budget meeting.
Recognized for excellence.
PROJECTS DELIVERED ACROSS THE GLOBE
Which Reliability Indices Does the Study Calculate?
A power system reliability study reports reliability indices that describe the frequency, duration and consequence of outages. Utilities often set internal or regulatory targets for SAIDI and SAIFI, and the study checks whether the network can meet them. These reliability indices are the shared language utilities and plant teams use to compare design options.
| Index | Full form | What it tells you |
| SAIFI | System Average Interruption Frequency Index | Interruptions per customer or load per year |
| SAIDI | System Average Interruption Duration Index | Outage minutes or hours per customer per year |
| CAIDI | Customer Average Interruption Duration Index | Average restoration time per interruption (SAIDI ÷ SAIFI) |
| ASAI | Average Service Availability Index | Share of the year that supply is available |
| ASUI | Average Service Unavailability Index | Share of the year that supply is not available |
| EENS | Expected Energy Not Supplied | Energy (MWh per year) that loads would miss because of outages |
SAIFI, SAIDI and CAIDI are defined for utility distribution networks in IEEE Std 1366. Industrial plants, where the “customer” is a bus, motor control centre or process unit, usually rely on load point reliability indices built from failure rate, outage duration and annual unavailability. The IEEE Gold Book (IEEE Std 493) and IEEE Std 3006.8 describe that approach and the equipment data behind it.

A Worked SAIDI and SAIFI Example
Here is a simple hypothetical. Tracking SAIDI and SAIFI year on year shows whether upgrades are working. A feeder group serves 10,000 customers. In one year, one fault interrupts 1,500 customers for 90 minutes and another interrupts 4,000 customers for 30 minutes.
- SAIFI = (1,500 + 4,000) ÷ 10,000 = 0.55 interruptions per customer
- SAIDI = [(1,500 × 90) + (4,000 × 30)] ÷ 10,000 = 25.5 minutes per customer
- CAIDI = 25.5 ÷ 0.55 ≈ 46 minutes per interruption

Why Commission a Power System Reliability Study?
An outage costs more than the repair. Production stops, batches are scrapped, penalties apply and safety systems may be stressed. A power system reliability study gives you four practical benefits:
- Operational continuity. It exposes single points of failure before they trip a production line or a substation.
- Quantified risk. The reliability indices show the probability and expected frequency of load interruptions, not just a general sense of concern.
- Right-sized redundancy. Critical loads are protected without paying for backup that the numbers do not justify.
- Better maintenance planning.Reliability indices let maintenance move from fixed calendars toward the equipment that actually drives risk.
How We Carry Out a Power System Reliability Study
Our power system reliability study follows five steps. Each one produces something you can review.
- System modelling. We build or validate the single-line diagram and assign component data (failure rates, repair and switching times, availability) from IEEE data sources, manufacturer information and your own outage records where they exist.
- Failure mode analysis. We simulate how each component failure propagates, including combinations of events.
- Reliability indices calculation. We compute system-wide and load-point reliability indices such as SAIFI, SAIDI, ASAI and EENS.
- Load point reliability assessment. We rank buses and consumers by risk so you can see which loads are most exposed. Load point values of SAIFI and SAIDI show who suffers the most interruptions and the longest ones.
- Recommendations. We test options such as reconfiguration, automation, standby generation and improved protection, and compare their effect on the reliability indices.
Your own data matters in any power system reliability study. Where site records are thin, we state the assumptions behind the generic data, so you know exactly how far to trust each result.

N-1 and N-2 Contingency Analysis
N-1 contingency analysis checks whether the network keeps supplying all loads after any single component fails. N-2 repeats the test with two components out at the same time, either together or while one is already under maintenance.
For example, a plant fed by two transformers should survive the loss of either one (N-1). The N-2 case reveals what happens when one transformer is under maintenance and the other trips. The contingency analysis results feed straight into the reliability indices, so you see both the consequence and the likelihood.

What You Receive from a Power System Reliability Study
Key Deliverables
- System-wide and load point reliability indices, including SAIFI and SAIDI
- Equipment failure impact summary and reliability indices by scenario
- Risk and consequence matrix
- Cost-effective technical recommendations, ranked by benefit
- Reports, labelled one-line diagrams and simulation outputs
- Native software files for your team’s later use
Practical Ways to Improve Reliability
Once the power system reliability study identifies the weak points, the usual remedies are:
- Redundancy: spare transformers, second feeders, alternate sources
- Automation and protection: faster fault isolation and automatic restoration
- Predictive maintenance: targeting equipment with the highest failure contribution
- Load point protection: extra backup for critical buses, such as UPS or standby generation
- Network reconfiguration: sectionalising and tie points that limit how many loads one fault affects
The study ranks these by their effect on the reliability indices, so a high-cost upgrade only goes ahead if it moves the numbers.

Who Needs a Power System Reliability Study?
- Utilities that report SAIFI and SAIDI and need to target worst-performing feeders
- Industrial facilities where a trip means lost production or process hazards
- Infrastructure projects such as data centres, metros, airports and hospitals that cannot tolerate long outages
- Renewable energy developers assessing grid connection and plant availability
- Expansion projects where new load is being added to an existing network
Standards and Software
The calculation methods and equipment data in our power system reliability study draw on IEEE Std 1366, IEEE Std 493 and IEEE Std 3006.8, with IEC references where project specifications require them. Modelling is done in dedicated reliability and power system software, including ETAP, Isograph and MAROS.
Why iFluids Engineering for a Power System Reliability Study?
- Experience across industrial, utility and renewable energy projects
- A data-driven approach aimed at less downtime and longer asset life
- Ability to analyse complex N-1 and N-2 scenarios
- Management systems certified to ISO 9001, ISO 14001, ISO 27001 and ISO 45001
- Customisable reports and native files, with on-site support where needed
Frequently Asked Questions
It depends on network size and data quality. A single plant with a clean single-line diagram needs far less time than a multi-substation utility network. We confirm the schedule after reviewing your drawings and outage records.
Single-line diagrams, equipment lists, protection and switching details, load data and any outage history. Missing items can be covered with published failure data, with the assumptions documented.
SAIFI counts how often customers lose supply. SAIDI measures how long they are without it. A network can have low SAIFI but high SAIDI if a few outages last very long. A high SAIDI with a modest SAIFI points to slow restoration, while a high SAIFI points to frequent faults or weak protection.
No. Load flow and short circuit studies assess the network under defined operating or fault conditions. A power system reliability study estimates long-term outage frequency and duration using failure statistics.
Yes. By comparing reliability indices and EENS before and after each option, you can see which upgrade delivers the most reliability for the spend.
Talk to Our Engineers
Planning a power system reliability study for your plant or network? Contact iFluids Engineering with your single-line diagram and we will scope the work with you.