QRA for IOCL’s Methanol Tank Relocation, Gujarat Refinery

Last updated: September 10, 2026

Indian Oil Corporation Ltd (IOCL) needed to relocate two existing methanol storage tanks, Tank 1103 and Tank 1104, at its Gujarat Refinery in Dumad, Vadodara, to clear the footprint required for a new Normal Butanol (NBA) unit under construction as part of the refinery’s Acrylics/Oxo-Alcohol project, which also adds Acrylic Acid (90 kTA) and Butyl Acrylate (150 kTA) production and modifies the existing Hydrogen Generation Unit (HGU-II). iFluids Engineering carried out a Quantitative Risk Assessment (QRA) for the relocation, quantifying the risk the two tanks present at their new position, assessing whether existing control measures remained adequate after the move, and evaluating hazard consequences to personnel at a range of distances. Relocating an already-operating, already-classified tank is not the same engineering problem as siting a new one: the QRA had to test whether a proven layout still holds once the surrounding unit boundaries change.

FieldDetail
SectorOil & Gas / Petrochemical (Brownfield Modification)
LocationGujarat Refinery, Dumad, Vadodara, Gujarat, India
Facility TypeExisting methanol storage tanks (2): Tank 1103, Tank 1104
ClientIndian Oil Corporation Ltd (IOCL)
Scope of WorkQRA for relocation of two existing methanol tanks to clear the footprint of the new NBA (Normal Butanol) unit, part of the Acrylics/Oxo-Alcohol project at Dumad
Standards / Regulatory FrameworkPetroleum Rules, 2002 (Class A petroleum); IS 7444:1974; OISD-STD-118; PESO

The Engineering Challenge of Relocating IOCL’s Methanol Tanks at Gujarat Refinery

Relocating Tank 1103 and Tank 1104 for the new NBA unit does not just move two vessels; it resets every spacing, ignition-source, and dispersion distance the original tank farm layout relied on, and methanol’s Class A status leaves less margin for error than the fuels stored elsewhere on site.

Methanol’s flash point of 12°C classifies it as Class A petroleum under India’s Petroleum Rules, 2002. The Petroleum Rules, 2002 define Class A petroleum as any liquid with a flash point below 23°C, and that classification governs the minimum separation distances a QRA must verify before the tanks can occupy their new position. A Class A liquid ignites at a lower ambient temperature and disperses a flammable vapour cloud more readily than the Class B and Class C fuels IOCL stores at comparable depots and terminals, so the consequence models for a loss-of-containment event at the relocated tanks assume a wider ignition envelope than a standard petroleum-product QRA would. The NBA unit under construction is also not a fixed, permanent neighbour in the way an existing process unit is: its intended equipment layout, not an as-built one, is what determines how close an ignition source or an occupied work area will eventually sit to the relocated tanks.

Getting that separation distance right before the NBA unit’s layout is locked in is the only point at which a spacing shortfall can still be corrected without a second relocation.

iFluids’ QRA Approach and Methodology

iFluids Engineering’s Quantitative Risk Assessment (QRA) service identifies credible loss-of-containment scenarios at the relocated tanks, quantifies their consequence and frequency, and verifies that existing control measures remain adequate once the tanks sit in a new position relative to the NBA unit.

The methodology followed a standard sequence for the Tank 1103 and Tank 1104 relocation:

  1. Hazard identification: catalogue credible loss-of-containment scenarios for both methanol tanks at their new location.
  2. Consequence modelling: quantify pool fire, flash fire, and vapour dispersion effect distances specific to methanol’s Class A volatility.
  3. Frequency analysis: assign failure frequencies to each scenario using recognised process industry failure-rate data for atmospheric storage tanks.
  4. Risk quantification: combine consequence and frequency into individual risk contours around the relocated tanks.
  5. Control measure adequacy review: verify that the tanks’ existing dyking, earthing, and venting arrangements remain sufficient at the new position.
  6. Risk reduction recommendations: where the revised layout falls short, recommend engineering or procedural mitigation before the tanks return to service.

IS 7444:1974, the Bureau of Indian Standards’ Code of Safety for Methanol, requires storage tanks to be earthed to prevent static-electricity accumulation, sealed with vent pipes and flame arresters, surrounded by dykes sized to contain the tank’s inventory, and fitted with lightning conductors, and the QRA verified each of these against the relocated tanks’ actual installed condition rather than assuming compliance from the original siting. That distinction matters because a tank moved to a new position needs its earthing, dyke capacity, and lightning protection re-verified against the new layout, not carried over unchecked from the old one.

Consequence distances for methanol vapour dispersion also depend on atmospheric stability class and wind speed local to the Dumad site, since a relocated tank sitting closer to a new construction boundary changes which wind directions carry a vapour cloud toward an occupied area.

0
A DECADE OF SAFETY, AN Ai POWERED FUTURE

Recognized for excellence.

0

PROJECTS DELIVERED ACROSS THE GLOBE

Technical Decisions and Engineering Rationale

Verifying Tank 1103 and Tank 1104’s existing containment and earthing measures against their new position, rather than assuming the original design still applies, is the technical decision that let the QRA correctly assess whether the relocation itself introduced any new risk.

OISD-STD-118 sets minimum spacing between storage tanks, process units, and site boundaries at petroleum and petrochemical installations, and that spacing baseline is what the QRA checked the tanks’ new position against once the NBA unit’s footprint was defined. A relocation changes which spacing constraint actually governs: where the original siting may have been limited by distance to an access road or a utility corridor, the new position is constrained by proximity to an operating petrochemical unit under construction, which the QRA had to treat as a distinct hazard source with its own ignition and occupancy profile. Static electricity is a specific risk methanol’s low electrical conductivity makes more acute than for most petroleum products, since a liquid that does not readily dissipate static charge during transfer or filling can generate an ignition source from the relocation work itself, not only from the tanks’ subsequent operation. IS 7444:1974 requires bonding and grounding of any container or tank car being filled or discharged, and confirming that requirement was met at both the original disconnection and the new reconnection point was part of verifying the relocation’s execution, not just its final layout.

PESO, the Petroleum and Explosives Safety Organisation, administers licensing for petroleum storage installations under the Petroleum Rules, and a change to an approved tank farm layout, such as relocating an existing tank, falls under PESO’s review of the revised site plan before the new layout can be treated as an authorised configuration.

Outcomes and Deliverables

The QRA gave IOCL a documented risk assessment for Tank 1103 and Tank 1104 at their relocated position, verifying that existing containment, earthing, and spacing measures remained adequate against Class A petroleum criteria and identifying where the revised layout needed further mitigation before the NBA unit’s construction proceeded.

DeliverableStandard / CriteriaOutcome
QRA report (hazard identification, consequence and frequency analysis)Petroleum Rules, 2002 (Class A); IS 7444:1974Risk quantified for Tank 1103 and Tank 1104 at their relocated position
Control measure adequacy reviewIS 7444:1974 (dyking, earthing, venting)Existing containment and static-control measures verified against the new layout
Risk reduction recommendations registerOISD-STD-118Mitigation measures identified for any spacing or consequence gap introduced by the relocation

PESO requires a review of the revised site plan before a relocated tank farm layout can be treated as an authorised configuration, which is why this risk assessment functioned as a precondition for resuming operation rather than a supplementary check performed afterward.

Lessons and Applicability for Brownfield Tank Relocation Projects

Brownfield projects that relocate existing hazardous-material storage to make way for new construction, including iFluids’ QRA for the tank truck loading gantry relocation at Gujarat Refinery, share a lesson worth generalising from the methanol tank relocation: an asset’s original siting compliance does not carry over automatically once its neighbours change.

A refinery planning a similar brownfield expansion should expect any relocated tank, gantry, or other hazardous-material asset to need its spacing, containment, and static-control measures re-verified against the new layout, not assumed compliant because they satisfied the original siting. OISD-STD-118 governs tank-to-boundary spacing uniformly across a site, but it does not by itself confirm that a tank moved after original construction still satisfies that spacing once its neighbours change, so that confirmation has to be re-run project by project rather than assumed from the standard alone. Any operator sequencing a new unit’s construction around an existing tank farm should treat that sequencing itself, not just the final layout, as something the QRA needs to examine, since a relocation executed out of order can create a transient risk the finished layout would never show.

Conclusion and Next Steps

iFluids Engineering’s QRA for IOCL’s Tank 1103 and Tank 1104 relocation at Gujarat Refinery verified that the tanks’ containment, earthing, and spacing measures remained adequate against Class A petroleum criteria at their new position, ahead of the NBA unit’s construction under the Acrylics/Oxo-Alcohol project. This project is representative of iFluids’ work for refinery and petrochemical operators across India who need an existing hazardous asset’s risk profile re-verified whenever brownfield construction changes its surroundings, not reassessed as if it were a new installation. If your facility needs a Quantitative Risk Assessment for a tank, gantry, or storage asset relocation, contact iFluids Engineering to discuss scope.